Reid Road Reservoir Quarry ARA Application

Cover Letter July 27

RRRQ Site Plans Nov 2020

February 4, 2020: Complaint Tracking and Resolution Protocol

JDCL RRRQ Draft Implementation Guide Aug 31 Final

Tables & Figures for Feb 5th 2020 Addendum

Updated Table 2 - with Caretakers Residence

JDCL Reid Road Reservoir Best Management Practices Plan #1701868

Road Safety Impact Study Final Report

Geotechnical Investigation Culvert Replacement Report

Pavement Structure Evaluation Supplemental Comments

Application Update and Mailing September 30, 2020

Interim Application Update July 2020

General Response April 25, 2019

Traffic Video Information - April 2019

Peak Truck Traffic Simulation Video

MHBC Summary Statement - July 2018

ARA Site Plans - July 2018

The site plans are the technical document that MNRF uses to administer the site.
ARA Site Plans – July 2018

Harden Hydrogeological Assessment - July 2018

The hydrogeological assessment characterizes existing ground and surface water, and assesses the impacts, if any, that the quarry could potentially have. It also details any required monitoring.  This is a very large file, please be patient as it may take a few minutes to load.


Full Report
Harden Hydrogeological Assessment – July 2018


Split Report

Report Text (pg. 1-78)

Figures (pg.79-124)

Tables (pg.125-149)

Appendix A-E

Appendix F-H

GWS Natural Environment Report - July 2018

The natural environment report characterizes the natural environment of the quarry and outlines any potential impacts, if any, the quarry may have. It also recommends mitigation measures and environmental enhancements.

GWS Natural Environment Report – July 2018

Paradigm Traffic Impact Study - June 2018

The site is located in very close proximity to the 401 highway, this report details how traffic will move between the 401 and the quarry.

Paradigm Traffic Impact Study – June 2018

Aercoustics Noise Impact Study - December 2017

The noise impact study characterizes the existing noise regime on the site and assesses any impacts.

Aercoustics Noise Impact Study – December 2017

Explotech Blast Impact Analysis - June 2018

The blasting impact report assesses the impacts of blasting and makes recommendations to ensure blasting operations are safe and within provincial standards.

Explotech Blast Impact Analysis – June 2018

RWDI Air Quality Assessment - June 2018

RWDI Best Management Practices Plan - June 2018

York North Archaeological Report - July 2017

This archaeological report details how the entire site was previously disturbed by past gravel pit operations, and as such there is no archaeological potential within the operational area.

York North Archaeological Report – July 2017